• maintenance procedures were not followed;
• the operator did not visually check that the isolation valve
to the pressure relief valve was open before steaming the
tubes of the exchanger;
• the head count was not correctly performed and a missing
worker was not identified as being missing;
• established safety drills were not held in the facility on a
regular basis so that the workers and management were not
properly prepared to adequately respond to the incident