The base material is cut into the required size of
400
105
8mm
3
. V shaped grove was used and two passes of
FCAW were performed using copper substrate as well. The plates
were joined firstly in the root pass and then second cover pass
respectively. A schematic weld joint configuration is shown in
Fig