Environmental risk assessment of small hydropower (SHP) plants:
A case study for Tefen SHP plant on Filyos River
Amulti-criteria scoring tool is used to assess the environmental risk level of small hydropower plants on the basis
of documented evidence, measured data, and on-site observations. The assessment is based on evaluating compliance
with the standards of the European Bank for Reconstruction and Development (EBRD). The following
environmental criteria are assessed: environmental flow, water quality, fish passage and protection, watershed
protection, threatened and endangered species. I evaluated the Tefen hydropower plant, which has been in
operation on the Filyos River in northwestern Turkey since 2011. The assessment showed that the plant failed
all of the EBRD criteria.
Environmental risk assessment of small hydropower (SHP) plants:
A case study for Tefen SHP plant on Filyos River
Amulti-criteria scoring tool is used to assess the environmental risk level of small hydropower plants on the basis
of documented evidence, measured data, and on-site observations. The assessment is based on evaluating compliance
with the standards of the European Bank for Reconstruction and Development (EBRD). The following
environmental criteria are assessed: environmental flow, water quality, fish passage and protection, watershed
protection, threatened and endangered species. I evaluated the Tefen hydropower plant, which has been in
operation on the Filyos River in northwestern Turkey since 2011. The assessment showed that the plant failed
all of the EBRD criteria.