8. The primary objective is to test the feasibility of information exchange in an integrated secured environment adhering to the technical design of the ASW Pilot Project Component 1 as agreed by ASEAN Member States (AMS).
9. The development and implemention of an integrated secured network adhering to the technical design of the ASW Pilot Project Component 1 as agreed by AMS for the implementation of ASEAN Single Window on a pilot basis should achieve the following:
9.1. It should provide AMS the required capacity and resilience to enable connectivity between NSWs of AMS to facilitate exchange of information within 14 months from project start-up.
9.2. It should allow connectivity and interoperability between heteregeneous platforms through a secure network with high reliability performance. The architecture should support various protocols and exchange paradigms (e.g. synchronous, asynchronous) within a secure operating environment.