The management of wastewater from the production line 1
.The wastewater from activities 1 ) to 3) and 8) will be sent to the therapy also treatment system of wastewater treatment project, which is a system of physical and chemistry work together. For therapy to the basis. Industrial Industrial East (map TA phut).Before submission to the clarifier left (Wastewater Hold Up Tank) and sent to the pond check (Inspection Pit) and then send the login, treatment of industrial wastewater centralized industrial east. (map TA phut)