Preparation for Shipping
A. Shipping Box
Prefabricated piping shall be sectionalized for shipping and handling and shall conform to a box size established for the project.
Note: If the Engineering Contractor does not indicate field weld locations on the isometric drawings, Fabricator shall set the shipping size based on the type of shipment (truck, sea van (container), or other) and handling requirements.
B. Cleaning
Pipe requiring special cleaning and protection shall be noted on the piping drawing. The cleaning requirements shall be in accordance with Specification L2CC-000-50SP-5028/SLCP-50-08.
C. Painting
Surface preparation and painting shall be in accordance with Specification L2CC000-55-SP-0020/SLCP-81-01.
D. Piece Marking and Color Coding
1. Piece mark numbers and field welds for shop fabricated piping are indicated on the piping drawings. Fabricated pieces shall be identified by the appropriate piece mark number and color code as indicated on the piping drawings. Piece marking shall be as listed in Attachment 01.
2. For austenitic stainless steel and nickel materials marking paint or ink shall not contain any chlorides, metal, or metal salts such as zinc, lead, or copper which cause corrosive attack upon heating.