For the Pull-type manufacturing system, it is scheduled that station k withdraws material from the previous station k-1. After completing the process required on station k, the WIP from this station are send forward to the downstream station k+1, at the same time the kanban card will be sending backward to the upstream station k-1, which actuates the production of the next container of material