Thank you for sending me kha. Please see my comments as follow: Normally,
• Civil contractor need to buy insurance to cover all loss/accident/damages which can be happened at our site but I didn’t see such requirement on their scope. It means that we don’t need or else
Reply : Thanks for remind. Normally, it will be the regular responsible of contractor and talk during negotiation. By the way, I will add it to the general scope.
• Civil contract will request for limit their liability/penalty. Do you think they will accept the non-identify maximum penalty/liability? If we are serious, we need to put the penalty higher than 0.1%. I think we are serious on the timeline, right? Why not we put the higher penalty for delay? Just curious
Reply : We do serious on project time line by the way, if we raise the high penalty cost, they may increase the price or not ?
• I think you put the wrong work completion date. It shall be 30 June 2016 not 2015
Reply : Thank you for this , I already changed it after sending.
• Please specify the item no. 2 “get bid back” to be “submit the closed envelop bid”
Reply : Ok, will specify submit with hard copy with the signature and CD of excel file 1 set.
• The utilities cost will be responsible by civil contractor, right?
Reply : Yes. Already identified.
• I didn’t see the project scope. I assume that it will be on the bidding documents, right? Ex. building size, road size, how many constructed buildings etc.
Reply : Yes, Since the less of drawings and blank BOQ are too big file. They will be attached to the CD for contractors.
• It’s turnkey project or just only civil part, kindly confirm
Reply : Civil only.
• Do we specify any “brand” or “specification” on the BOQ? Ex. steel size, concrete specification, any piling etc.
Reply : We have identified in detailed specification in drawing.
I’m sorry since I didn’t see the BOQ, can you share me the template?
Reply : Since they are big file, will update you on Monday.
Thank you for sending me kha. Please see my comments as follow: Normally, • Civil contractor need to buy insurance to cover all loss/accident/damages which can be happened at our site but I didn’t see such requirement on their scope. It means that we don’t need or elseReply : Thanks for remind. Normally, it will be the regular responsible of contractor and talk during negotiation. By the way, I will add it to the general scope. • Civil contract will request for limit their liability/penalty. Do you think they will accept the non-identify maximum penalty/liability? If we are serious, we need to put the penalty higher than 0.1%. I think we are serious on the timeline, right? Why not we put the higher penalty for delay? Just curious Reply : We do serious on project time line by the way, if we raise the high penalty cost, they may increase the price or not ?• I think you put the wrong work completion date. It shall be 30 June 2016 not 2015Reply : Thank you for this , I already changed it after sending.• Please specify the item no. 2 “get bid back” to be “submit the closed envelop bid”Reply : Ok, will specify submit with hard copy with the signature and CD of excel file 1 set. • The utilities cost will be responsible by civil contractor, right?Reply : Yes. Already identified.• I didn’t see the project scope. I assume that it will be on the bidding documents, right? Ex. building size, road size, how many constructed buildings etc.Reply : Yes, Since the less of drawings and blank BOQ are too big file. They will be attached to the CD for contractors.• It’s turnkey project or just only civil part, kindly confirmReply : Civil only.• Do we specify any “brand” or “specification” on the BOQ? Ex. steel size, concrete specification, any piling etc.Reply : We have identified in detailed specification in drawing. I’m sorry since I didn’t see the BOQ, can you share me the template? Reply : Since they are big file, will update you on Monday.