The target rate is apportioned among contributing producers using one of the available
apportionment methods (e.g. guide rate, instantaneous potential, priority ranking, and internal
guide rate) specified by *APPOR-METHOD. All producers must have a minimum BHP. If
none is specified, a minimum BHP of 101.325 kPa is assigned.