Safety and health in building and civil engineering
at a speed in excess of the authorised maximum; or
with a greater number of persons or a heavier load of material
than the authorised maximum.
32.4.10.
After every stoppage of hoisting for repairs or other
reason, the conveyance should be run empty up and down the work-
ing part of the shaft at least once.
32.4.11.
Except for repair purposes, hoisting operations should
not be carried on in shafts any part of which is being repaired.