The total road length in the case study area is 19.89 km and
the optimal road length in the case study area is 12 km. The optimal
path length can reduce the number of waste transfer vehicles
(small size vehicles) and also reduces the waste transfer time.
Therefore, this optimization path marginally reduces the transfer
cost of municipal solid waste.