objects in an HV test laboratory (Fig. 7.15a) to avoid breakdowns of the air gap
between the HV circuit and the surroundings. The necessary clearance depends on
the kind of pre-discharges which determine the breakdown process. The optimum
design of the electrodes of the HV components enables not only the correct
operation of an LI/SI test system but ensures also their minimum space in the test
laboratory.