as in figure
set the steel plate (Tool list No.6) under the gear
heating the gear by gas banner (Maximum 120 and do not heat the gear surface directly)
align the center of the output shaft and the gear with a crane then to insert in its own weight to down the crane
installation of the bearing as in figure
set the 1 piece jig stand
take out crane lifting then install the bearing by bearing heating
maximum