Standardcontinuoussamplingproceduresandtablesareconventionallyapplicab การแปล - Standardcontinuoussamplingproceduresandtablesareconventionallyapplicab ไทย วิธีการพูด

Standardcontinuoussamplingprocedure

Standardcontinuoussamplingproceduresandtablesareconventionallyapplicableonlytocontinuous
production processesthatarestatistically ‘in-control’. Consequently,thesestandardscannotbeusedto
control qualityindeterioratingproductionprocesses.Moreover,existingcontinuoussamplingmodelsdo
not considerinteractionswithproduction,inventoryandmaintenanceaspects.Inthispaper,weattempt
to fill thesegapsintheliterature.Weinvestigatethejointdesignandoptimizationofatype-1con-
tinuous samplingplan(CSP-1),make-to-stockproductionandpreventivemaintenanceofastochastic
production systemsubjecttobothqualityandreliabilitydeteriorations.TwomodelsofCSP-1arecon-
sidered andcompared:theclassicalCSP-1asinthestandardprocedures,andaCSP-1planwitha
stopping rulethatiscombinedwithcondition-basedmaintenance.Forbothmodels,theoptimization
problem istominimizethetotalincurredcostunderaconstraintontheoutgoingquality.Acombination
of mathematicalformulation,simulationandoptimizationtechniquesisusedtosolvesuchstochastic
and constrainedproblems.Numericalexamplesaregiventoillustratetheresolutionapproachandto
highlight someinterestingaspectsintheinteractionsbetweenproduction,inventory,quality,main-
tenance andreliability.Theresultsobtaineddemonstratethatsamplinginspectionplansrealizesig-
nificant costsavingscomparedtothe100%inspectionwhichiscommonlyusedintheliteratureof
integratedmodels,andthatusingtheCSP-1withaninspectionstoppingrulefordeterioratingprocesses
is morecost-effectivethantheclassicalCSP-1.
0/5000
จาก: -
เป็น: -
ผลลัพธ์ (ไทย) 1: [สำเนา]
คัดลอก!
Standardcontinuoussamplingproceduresandtablesareconventionallyapplicableonlytocontinuousผลิต processesthatarestatistically 'ในการควบคุม' ดังนั้น thesestandardscannotbeusedtoควบคุม qualityindeterioratingproductionprocesses นอกจากนี้ existingcontinuoussamplingmodelsdoไม่ considerinteractionswithproduction, inventoryandmaintenanceaspects Inthispaper, weattemptเติม thesegapsintheliterature Weinvestigatethejointdesignandoptimizationofatype-1con -tinuous samplingplan(CSP-1) ทำ stockproductionandpreventivemaintenanceofastochasticผลิต systemsubjecttobothqualityandreliabilitydeteriorations TwomodelsofCSP-1arecon -sidered andcompared:theclassicalCSP-1asinthestandardprocedures, andaCSP-1planwithaหยุดการ rulethatiscombinedwithcondition-basedmaintenance Forbothmodels, theoptimizationปัญหา istominimizethetotalincurredcostunderaconstraintontheoutgoingquality Acombinationของ mathematicalformulation, simulationandoptimizationtechniquesisusedtosolvesuchstochasticและ constrainedproblems Numericalexamplesaregiventoillustratetheresolutionapproachandtoเน้น someinterestingaspectsintheinteractionsbetweenproduction สินค้าคงคลัง คุณภาพ หลัก-tenance andreliability Theresultsobtaineddemonstratethatsamplinginspectionplansrealizesig-nificant costsavingscomparedtothe100% inspectionwhichiscommonlyusedintheliteratureofintegratedmodels, andthatusingtheCSP-1withaninspectionstoppingrulefordeterioratingprocessesคือ morecost-effectivethantheclassicalCSP-1
การแปล กรุณารอสักครู่..
ผลลัพธ์ (ไทย) 2:[สำเนา]
คัดลอก!
Standardcontinuoussamplingproceduresandtablesareconventionallyapplicableonlytocontinuous
ผลิต processesthatarestatistically ในการควบคุม ' ดังนั้น thesestandardscannotbeusedto
qualityindeterioratingproductionprocesses.Moreover ควบคุม existingcontinuoussamplingmodelsdo
ไม่ considerinteractionswithproduction, inventoryandmaintenanceaspects.Inthispaper, weattempt
เพื่อเติมเต็ม thesegapsintheliterature.Weinvestigatethejointdesignandoptimizationofatype-1con-
tinuous samplingplan (CSP-1) ให้ไป stockproductionandpreventivemaintenanceofastochastic
ผลิต systemsubjecttobothqualityandreliabilitydeteriorations.TwomodelsofCSP-1arecon-
ดูเสมือน andcompared: theclassicalCSP- 1asinthestandardprocedures, andaCSP-1planwitha
หยุด rulethatiscombinedwithcondition-basedmaintenance.Forbothmodels, theoptimization
ปัญหา istominimizethetotalincurredcostunderaconstraintontheoutgoingquality.Acombination
ของ mathematicalformulation, simulationandoptimizationtechniquesisusedtosolvesuchstochastic
และ constrainedproblems.Numericalexamplesaregiventoillustratetheresolutionapproachandto
ไฮไลท์ someinterestingaspectsintheinteractionsbetweenproduction
สินค้าคงคลังที่มีคุณภาพรุงรักษาบำรุงandreliability.Theresultsobtaineddemonstratethatsamplinginspectionplansrealizesig-
nificant morecost-effectivethantheclassicalCSP-1

การแปล กรุณารอสักครู่..
 
ภาษาอื่น ๆ
การสนับสนุนเครื่องมือแปลภาษา: กรีก, กันนาดา, กาลิเชียน, คลิงออน, คอร์สิกา, คาซัค, คาตาลัน, คินยารวันดา, คีร์กิซ, คุชราต, จอร์เจีย, จีน, จีนดั้งเดิม, ชวา, ชิเชวา, ซามัว, ซีบัวโน, ซุนดา, ซูลู, ญี่ปุ่น, ดัตช์, ตรวจหาภาษา, ตุรกี, ทมิฬ, ทาจิก, ทาทาร์, นอร์เวย์, บอสเนีย, บัลแกเรีย, บาสก์, ปัญจาป, ฝรั่งเศส, พาชตู, ฟริเชียน, ฟินแลนด์, ฟิลิปปินส์, ภาษาอินโดนีเซี, มองโกเลีย, มัลทีส, มาซีโดเนีย, มาราฐี, มาลากาซี, มาลายาลัม, มาเลย์, ม้ง, ยิดดิช, ยูเครน, รัสเซีย, ละติน, ลักเซมเบิร์ก, ลัตเวีย, ลาว, ลิทัวเนีย, สวาฮิลี, สวีเดน, สิงหล, สินธี, สเปน, สโลวัก, สโลวีเนีย, อังกฤษ, อัมฮาริก, อาร์เซอร์ไบจัน, อาร์เมเนีย, อาหรับ, อิกโบ, อิตาลี, อุยกูร์, อุสเบกิสถาน, อูรดู, ฮังการี, ฮัวซา, ฮาวาย, ฮินดี, ฮีบรู, เกลิกสกอต, เกาหลี, เขมร, เคิร์ด, เช็ก, เซอร์เบียน, เซโซโท, เดนมาร์ก, เตลูกู, เติร์กเมน, เนปาล, เบงกอล, เบลารุส, เปอร์เซีย, เมารี, เมียนมา (พม่า), เยอรมัน, เวลส์, เวียดนาม, เอสเปอแรนโต, เอสโทเนีย, เฮติครีโอล, แอฟริกา, แอลเบเนีย, โคซา, โครเอเชีย, โชนา, โซมาลี, โปรตุเกส, โปแลนด์, โยรูบา, โรมาเนีย, โอเดีย (โอริยา), ไทย, ไอซ์แลนด์, ไอร์แลนด์, การแปลภาษา.

Copyright ©2026 I Love Translation. All reserved.

E-mail: