Dear sirs,
With regard to the SITE VISIT REPORT, please let us know what is right tolerance in Born erection procedure.
We are confused in procedure such as below, because the procedure just mention about 10mm of tolerance of “first unit” which is not a cell.
Even though the tolerance, 10mm, seems to be apply with around first unit, but we cannot understand what criteria to cover whole panels.
Therefore, Born erection procedure is requested to support a criteria of each inspection point ( ex. Vertical, Level, Roundness & etc.) for heater erection, it is based on applicable specification
In additionally, we have doubted how Born supervisor had accepted and instructed to proceed the welding work on cells, therefore all of inspection sequence do not come out well at this moment.
Thanks