Completed member storage and Final inspection
• Does the Fabricator or Manufacturer understand that there is a 48-hr. notification for final inspection?
• Is the Fabricator or Manufacturer aware that they must provide complete paper work, including a certificate of compliance and weights, for final inspection and release from the shop?
• Does the Fabricator or Manufacturer have a designated location where material receives final inspection?
• Are completed members properly stored to prevent damage?
• Are all components traceable to MTR's?
• Does the Fabricator or Manufacturer understand that material release tags should be completed and attached only by the Engineer or his authorized representative