CONTRACTOR shall provide their requirements for the laboratory room and injection molding machine room, including any recommendations for the layout of the laboratory room and injection molding machine room to suit the laboratory functions to the PACKAGE 2 Contractor. The PACKAGE 2 Contractor shall design, incorporate the requirement and construct the laboratory room and injection molding room in according with the requirement.