The campus has a sufficient number of buildings, therefore the focus of the FC
component in Bolikharnsay will be on rehabilitation and equipment of workshops in
order to enable the school to offer training with appropriate and modern equipment.
In order to allow for an increase in the number of simultaneously enrolled students, it
will also be considered to provide additional student dormitories.
As per the current planning, the following measures should be considered:
a. Renovation of existing buildings is the first priority, including proper insulation of
d. Current dormitory facilities are not adequate, additional dormitories need to be
provided. A riew dormitory building is not only needed to provide current students
Bokeo
The campus is well-established and has infrastructure serving all the required main
functions (administration, classrooms, workshops, accommodation). As per the
current planning, the following measures should be considered:
a. Due to lacking proper maintenance rehabilitation works at the older buil
dings is required - and would be a first priority.
b. The construction of additional workshops - possibly three workshops at 150
sqm each. The school would then have a total of six functioning workshops.
c.
buildings to ensure teachers do not distburb each other while teaching. However
none of the existing classrooms are sufficiently equipped to allow for appropri
ate teaching. It is therefore proposed to provide additionally 12 new classrooms.
b. The existing workshops can be considered as being adequate in terms of size
and space - but need to be fully rehabilitated, possibly including a replacement of
the roofs. An additional workshop - with approx. 150-200 sqm in floorspace,
needs to be provided.
c. The available equipment at the school is very limited and outdated. New equip
ment is to be provided for all workshops - for the following trades:
1. automotive/motorcycle repair,
2. agriculture (crop plantation/animal husbandry),
3. electrical repair/installations
4. construction (masonry/carpentry).
with proper living conditions but also to allow access to the school for students
from remote areas.
I
However, it needs to be noted that the above summary list is subject to review and to
further detailing. The Implementation Consultant (to be appointed) will be tasked with
reviewing these options and submitting a detailed proposal, based on needs and
availabe resources, while also taking into consideration the manner in which the
disbursement requirements as outlined in section 8 have been met.
The campus has a sufficient number of buildings, therefore the focus of the FC
component in Bolikharnsay will be on rehabilitation and equipment of workshops in
order to enable the school to offer training with appropriate and modern equipment.
In order to allow for an increase in the number of simultaneously enrolled students, it
will also be considered to provide additional student dormitories.
As per the current planning, the following measures should be considered:
a. Renovation of existing buildings is the first priority, including proper insulation of
d. Current dormitory facilities are not adequate, additional dormitories need to be
provided. A riew dormitory building is not only needed to provide current students
Bokeo
The campus is well-established and has infrastructure serving all the required main
functions (administration, classrooms, workshops, accommodation). As per the
current planning, the following measures should be considered:
a. Due to lacking proper maintenance rehabilitation works at the older buil
dings is required - and would be a first priority.
b. The construction of additional workshops - possibly three workshops at 150
sqm each. The school would then have a total of six functioning workshops.
c.
buildings to ensure teachers do not distburb each other while teaching. However
none of the existing classrooms are sufficiently equipped to allow for appropri
ate teaching. It is therefore proposed to provide additionally 12 new classrooms.
b. The existing workshops can be considered as being adequate in terms of size
and space - but need to be fully rehabilitated, possibly including a replacement of
the roofs. An additional workshop - with approx. 150-200 sqm in floorspace,
needs to be provided.
c. The available equipment at the school is very limited and outdated. New equip
ment is to be provided for all workshops - for the following trades:
1. automotive/motorcycle repair,
2. agriculture (crop plantation/animal husbandry),
3. electrical repair/installations
4. construction (masonry/carpentry).
with proper living conditions but also to allow access to the school for students
from remote areas.
I
However, it needs to be noted that the above summary list is subject to review and to
further detailing. The Implementation Consultant (to be appointed) will be tasked with
reviewing these options and submitting a detailed proposal, based on needs and
availabe resources, while also taking into consideration the manner in which the
disbursement requirements as outlined in section 8 have been met.
การแปล กรุณารอสักครู่..

มหาวิทยาลัยมีจำนวนเพียงพอของอาคาร ดังนั้นโฟกัสของ FC
ส่วนประกอบใน bolikharnsay จะมีการฟื้นฟูและอุปกรณ์ของการประชุมเชิงปฏิบัติการใน
เพื่อที่จะช่วยให้โรงเรียนให้ฝึกกับอุปกรณ์ที่เหมาะสมและทันสมัย
เพื่อให้มีการเพิ่มจำนวนนักเรียนโรงเรียนพร้อมกัน มัน
จะได้รับการพิจารณาเพื่อให้หอพักนักศึกษาเพิ่มเติม
ตามแผนปัจจุบัน มาตรการต่อไปนี้ควรพิจารณา :
a ปรับปรุงอาคารที่มีอยู่เป็นอันดับแรก รวมถึงฉนวนที่เหมาะสมของ
D ปัจจุบันสิ่งอำนวยความสะดวกหอพักไม่เพียงพอ , หอพักเพิ่มเติมต้อง
ให้อาคารหอพักเป็นริวจะไม่เพียง แต่ต้องการที่จะให้นักศึกษาปัจจุบัน
bokeo วิทยาเขตจะดีขึ้นและมีโครงสร้างพื้นฐานที่ให้บริการทั้งหมดที่จำเป็นหลัก
ฟังก์ชัน ( บริหาร , ที่พักห้องเรียน , การประชุมเชิงปฏิบัติการ , ) เป็นต่อ
วางแผนปัจจุบัน มาตรการต่อไปนี้ควรพิจารณา :
. เนื่องจากการขาดการรักษาที่เหมาะสม ทำงานที่เก่าเท่ากอง
ค่ะเป็นสิ่งจำเป็นและจะเป็นอันดับแรก
b การสร้างการประชุมเชิงปฏิบัติการ - เพิ่มเติมอาจ สาม workshops ที่ 150
ตารางเมตรละ โรงเรียนก็จะมีทั้งหมดหกทำงานการประชุมเชิงปฏิบัติการ
.
อาคารเพื่อให้แน่ใจว่าครูจะไม่ distburb แต่ละอื่น ๆในขณะที่สอน อย่างไรก็ตาม
ไม่มีห้องเรียนที่มีอยู่จะเพียงพอพร้อมที่จะอนุญาตให้เหมาะสมอง
กินครูจึงเสนอให้เพิ่มใหม่ 12 ห้องเรียน
b การประชุมที่มีอยู่สามารถถือว่าเพียงพอในแง่ของขนาด
และพื้นที่แต่ต้องได้รับการฟื้นฟูอย่างเต็มที่ อาจจะรวมถึงการเปลี่ยน
หลังคา ฝึกอบรมเชิงปฏิบัติการ - เพิ่มเติมประมาณ 150-200 ตร. floorspace
ต้อง , ให้
Cอุปกรณ์ที่สามารถใช้ได้ที่โรงเรียนมีจำกัด และล้าสมัย ใหม่จัดให้อง
ติดขัดจะจัดการอบรม - ทั้งหมดสำหรับการซื้อขายต่อไปนี้ :
1 ซ่อมแซม ,
2 ยานยนต์ / รถจักรยานยนต์ เกษตร ( ปลูกพืช / เลี้ยงสัตว์ )
3 ซ่อม / ติดตั้งไฟฟ้า
4 การก่อสร้าง ( ปูน / ไม้ )
ที่เหมาะสมกับสภาพความเป็นอยู่ แต่ยังอนุญาตให้เข้าถึงนักเรียนโรงเรียน
จากพื้นที่ห่างไกล
ผม อย่างไรก็ตาม ต้องตั้งข้อสังเกตว่ารายการสรุปข้างต้นอาจมีการตรวจสอบและ
เพิ่มเติมรายละเอียด การใช้ที่ปรึกษา ( ได้รับการแต่งตั้ง ) จะ tasked กับ
ทบทวนตัวเลือกเหล่านี้ และส่งข้อเสนอรายละเอียดตามความต้องการและ
ทรัพยากรขาดหายไปในขณะที่ยังคำนึงถึงลักษณะที่
เบิกจ่ายความต้องการดังที่ระบุไว้ในมาตรา 8 ได้พบ
การแปล กรุณารอสักครู่..