• Permit shall be in triplicate. Original in pink color shall be for permittee, first copy (white) for issuer and
second copy (green) for Fire Station.
• The permit shall be issued normally for a period not exceeding 7 days with renewal in each shift.
However for shut down units/ facilities, it can be issued for a maximum period of 15 days with renewal in
each shift and for construction activities a maximum period of 30 days.
• The PPE such as Safety Helmet, Safety shoe, boiler suit and hand gloves is mandatory for work.
• Daily Safety tool box talk including key point tipping to contractor personnel shall be carried out by
permittee before commencement of work and the record of same shall be maintained.