Refer to your information “the efficiency of the thermal cycle would be slightly lower, however the required power output would be still produced by means of a slight increase of HHP import (roughly 1÷2 t/h for a 2°C increase of cooling water temperature) since the STG is overdesigned with respect to normal operating conditions” please clarify as below item