Some steps are choices. They may be switched off or by pass some time.
Small size:
- P12a 2nd Ozone adding in filling room
- When filling machine is stopped, label on empty bottle is done manually before P 13 bottle rinsing step, instead P14 filling & capping
- Alum using in P2a Raw water storage tank