This pilot site has two identical 315MVA, 11kV, 428.6 rpm hydro machines in a pump
storage facility [5]. These two generator-motor units are connected to the 220kV
transmission system. The new DC current measurement scheme was installed on
the excitation transformer of the first motor-generator unit.