For PD testing report is come from Quality assurance division.
They response for testing and inspection R/M.
I have advise them for the PD testing procedure only OPEN position.
Because the vacuum interrupter from Xinxin is OPEN position.
It’s easy to check and testing.
In the OPEN position we test both side of embedded pole to check PD in upper part and bottom part.