Responsibilities:
Mange the projects on-site. Making the site planning. Communicate with the costumers/suppliers. Installation of the pumps and test them.
Achievements:
Installation Storm water station: Pavaho (Dallas)
Assembly 7 CVP Pumps: Koradi (Coimbatore)
Trouble shooting 1 Chemical Pump: (Wuhu)
Installation 2 vertical water pump: (Hunxe)
Installation 2 CVP Pumps: (Krammer)