Require lifting crane barge, labor skills
• Clean and New Facility
• Well Engineered, well planned procedure
• Pile Hammering through seabed
• Weight Controlled, fixed center of Gravity (CG)
• New Structure High Integrity
• Hazardous Operation
• Jacket installation aided by gravity
• Accurate known weight
• Piles are always separate driven