semivariable costs. some costs contain both fixed and variable elements these are called semivariable costs. for example the cost of electricity is usually semivariable. electricity used for lighting tends to be a fixed cost because lights are needed regardless of the level of activity while electricity used as power to operate equipment will vary depending on the usage of the equipment. the following are other examples of semivariable overhead costs.