The manufacturer shall submit to the testing laboratory, drawings and other data containing
sufficient information to unambiguously identify by type the essential details and parts of the
switchgear and controlgear presented for test. A summary list of the drawings and data schedules shall be supplied by the manufacturer and shall be uniquely referenced and shall
contain a statement to the effect that the manufacturer guarantees that the drawings or data
schedules listed are the correct version and truly represent the switchgear and controlgear to
be tested.