Pickup and Delivery areas for all of the companies except the concrete materials company and the alum producer, required a paved area in the back and/or to the side of the building with enough room for a 650 semi-tractor trailer to circulate easily.
Pickup andDelivery areas for all of the companies except theconcrete materials company and the alum producer,required a paved area in the back and/or to the side ofthe building with enough room for a 650 semi-tractortrailer to circulate easily.