From both the computed and measured data, it is evident that if the toe of the embankment is not strengthened and proper drainage paths are not provided, the embankment toe can easily fail due to pore water pressure buildup. Therefore, when the pore water pressure buildup is reduced by introducing an improved embankment design (Figure 6) and proper construction method, the embankment was successfully constructed without any fur-ther incidents.