General site condition
Neighbor condition
Access to the site
Transmission line in front of the site
Soil condition
Estimate existing level compare to the main road
Existing big trees, pond, berm etc.
which will be effected to the site preparation.
Photo report with the their location in the plan
Potential location to build labour camp and site office indicate in the plan