The ratio of total TL to total cycle times T for each service truck in a day was:
T – T Ratio = (Time loss/cycle daily time) = Total time loss, TL /Number of trips x tnet
This shows that there is inherent time loss of time allowance in all cycle times for MSW collection to disposal either operator mental and physical fitness or machine worthiness of and environment both of them [5].