4 - No changes in water ordering, staff training, or mobility; 3.5 - Improved training, only. The basic procedures/conditions are just fine, they just are not being implemented to their full extent; 3.0 - Minor changes in water ordering, mobility, training, incentive programs; 2.0 - Major changes in 1 of the above; 1 - Major changes in 2 of the above; 0 - Need to completely revamp or convert almost everything.
4 - No changes needed; 3.5 - Only need to repair some of the existing structures so that they are workable again.; 3.0 - Improved communications, repair of some existing structures, and a few key new structures (less than US$300/ha needed), OR…very little change to existing, but new structures are needed for water recirculation; 2 - Larger capital expenditures - $US 300 - $US 600/ha; 1 - Larger capital expenditures needed (up to $US 1500/ha); 0 - Almost complete reworking of the system is needed
4 - Continuous feedback and continuous use of information to change inflows, with all key points monitored. Or, minimal feed back is necessary, such as with closed pipe systems.; 3 - Feedback several times a day and rapid use (within a few hours) of that information, at major points.; 2 - Feedback once/day from key points and appropriate use of information within a day; 1 - Weekly feedback and appropriate usage, or once/day feeback but poor usage of the information; 0 - No meaningful feedback, or else there is a lot of feedback but no usage.
4 - No changes in water ordering, staff training, or mobility; 3.5 - Improved training, only. The basic procedures/conditions are just fine, they just are not being implemented to their full extent; 3.0 - Minor changes in water ordering, mobility, training, incentive programs; 2.0 - Major changes in 1 of the above; 1 - Major changes in 2 of the above; 0 - Need to completely revamp or convert almost everything.4 - No changes needed; 3.5 - Only need to repair some of the existing structures so that they are workable again.; 3.0 - Improved communications, repair of some existing structures, and a few key new structures (less than US$300/ha needed), OR…very little change to existing, but new structures are needed for water recirculation; 2 - Larger capital expenditures - $US 300 - $US 600/ha; 1 - Larger capital expenditures needed (up to $US 1500/ha); 0 - Almost complete reworking of the system is needed4 - Continuous feedback and continuous use of information to change inflows, with all key points monitored. Or, minimal feed back is necessary, such as with closed pipe systems.; 3 - Feedback several times a day and rapid use (within a few hours) of that information, at major points.; 2 - Feedback once/day from key points and appropriate use of information within a day; 1 - Weekly feedback and appropriate usage, or once/day feeback but poor usage of the information; 0 - No meaningful feedback, or else there is a lot of feedback but no usage.
การแปล กรุณารอสักครู่..
