In a first step, the students have to plan, design and
implement a manual assembly system, which allows
producing two completely different products. Thus, the aim is
to encourage the students to build their assembly system as
flexible as possible. At the same time, students should also
develop concepts for the expansion of the assembly system in
terms of an increase of the production volume.