The tile drainage system installed in the salt-affected areas of Khyber Pakhtunkhwa
Province of Pakistan during 1979–1992 through the Salinity Control and Reclamation
Project (SCARP) lowered the water table, enhanced the water allowance, and improved
drainage coefficient (Khan and Awan 1997).