in most businesses, constant normal usage is not likely to occur because usage depends on production and production depend on sales. for instance, if the usage rate is as high as 210 units per week, with lead time normally 4 week but possibly as long as 9 weeks, then the safety stock is 1190 units and the order point 1890 Units, calculated as follows: