Within phase ii area , which means HTC area handed-over from JBE and controlled under HTC 'own permit-to-work procedure; red area and 20600 (inside building ).
1) hitachi can continue to work in the rain when there is no lightning.
2) hitachi can take lifting works up to 25 tons until 22:00.
* before starting works,HTC shall submit its work condition that sub-contractors shall follow, such as lighting ,organization for monitoring safty and rescue team, for JBE's reviewing in advance.
3)hitachi can use rolling tower, which is portable moveable scaffolding.
* up to 5 m (1.5×3layer)
* jis standard
* good condition(no rust, no corrosion, not overaged, not defected) equipped with stopper, hand rail and toe plate
* before starting works, HTC shall submit the specifications and calculations of all types that HTC will use for the work , for JBE's reviewing in advance .
-in any cases, HTC shall follow applicable laws and public regulations.
-JBE monitors and can stop whenever we find emergency problems and potential of high risk that is the same ruled as other activates (see next page).
-Contractor guarantees that its work and services hereunder (i)shall not cause the negative impact to the safty, environment, operation and maintenance of the Existing Facility and (ii) shall enable the operation and maintenance of the Existing Faccility and Facilities of Rung Tawan Project II on standalone basis and (iii) shall not cause the negative impact to the infrastructure of the Existing Facility. (Agreement 16.1.1)
Within phase ii area , which means HTC area handed-over from JBE and controlled under HTC 'own permit-to-work procedure; red area and 20600 (inside building ).1) hitachi can continue to work in the rain when there is no lightning.2) hitachi can take lifting works up to 25 tons until 22:00. * before starting works,HTC shall submit its work condition that sub-contractors shall follow, such as lighting ,organization for monitoring safty and rescue team, for JBE's reviewing in advance.3)hitachi can use rolling tower, which is portable moveable scaffolding.* up to 5 m (1.5×3layer)* jis standard* good condition(no rust, no corrosion, not overaged, not defected) equipped with stopper, hand rail and toe plate* before starting works, HTC shall submit the specifications and calculations of all types that HTC will use for the work , for JBE's reviewing in advance .-in any cases, HTC shall follow applicable laws and public regulations.-JBE monitors and can stop whenever we find emergency problems and potential of high risk that is the same ruled as other activates (see next page).-Contractor guarantees that its work and services hereunder (i)shall not cause the negative impact to the safty, environment, operation and maintenance of the Existing Facility and (ii) shall enable the operation and maintenance of the Existing Faccility and Facilities of Rung Tawan Project II on standalone basis and (iii) shall not cause the negative impact to the infrastructure of the Existing Facility. (Agreement 16.1.1)