As PPS request show drawing and soft file of Shingle mapping and modulation for information for shingles LED information as reference 1. PISA had denied this request with the reason is not involve with shingle LED design as reference 2.
We would like to inform that responsibility to inform information of building part for coordination with contractor who prepares combined working drawing and/or shop drawing according to schedule that you informed and/or drawings that relate with scope of your work.
Therefore, we are pleased kindly request Shingles Mapping, Modulation and Shingles Fabrication Drawing soft file as soon as possible.