Characteristic (3), returned items must be disassembled before the product may be restored to full use. The effects of dis-assembly operations impact a large number of areas, including production control, scheduling, shop floor control, and materials and resource planning. The dis-assembly and subsequent release of parts to the re-manufacturing operations requires a high degree of coordination with reassembly to avoid high inventory levels or poor customer service.