(c) If activity A is started at time 5, determine the earliest possible start times for activities
C, D, E,and G.
(d) If activities F, G, and H require the same equipment, determine the minimum number
of units needed of this equipment.
6. Compute the floats and identify the red-flagged activities for the projects (a) and (b) in
Figure 6.44, then develop the time schedules under the following conditions:
(c) If activity A is started at time 5, determine the earliest possible start times for activities
C, D, E,and G.
(d) If activities F, G, and H require the same equipment, determine the minimum number
of units needed of this equipment.
6. Compute the floats and identify the red-flagged activities for the projects (a) and (b) in
Figure 6.44, then develop the time schedules under the following conditions: