Unfortunately confirmed findings are linked to the time point of the opening meeting. Anything after that needs to be part of a corrective action plan. Ratings are clearly defined e.g. A3.1 is the result of the working hour analysis not KPI plans.
The EICC does not require automatic sprinkler systems but does require appropriate suppression systems (for warehouse which are ‘unmanned” for most of the time automatic detection, alarm and resulting suppression is critical) in conformance with local law or EICC requirements whichever is stricter.
Heat inspection must be in place (not planned) by the time of the opening meeting. A planned head inspection does not reduce the rating, the intent is that a heat inspection and resulting actions must be in place to protect the worker, not a plan to)