The divided unit load shall be able to be rebuilt back to a unit load, including low handling material, with the same quantity and constraints as the standard unit load (see Section 10). The low handling material shall be included by the supplier in the same shipment. Special attention when using this filling solution is the Neat & Clean packaging requirements (see Section 10.4).