Results: The results show that the total amount of biomass corresponds to 2.8 TWh of energy of which agro materials account for more than 90%. It was found that a total of 49 biogas plants could be built in three case regions with feedstock available within maximum transportation radius of 10 or 40 km. With maximum of 10 km biomass transportation distance, the production capacity of the planned plants ranges from 2.1 to 8.4 MW. If transportation distance was increased to 40 km, the plant capacities could also increase from 2.3 to 16.8 MW.