Since the
slope increases as we move closer to point B, we obtain higher gain by locating Q as close to
B as possible. However, the closer Q is to the boundary point B, the smaller the allowable
magnitude of negative signal swing. Thus, as often happens in engineering design, we
encounter a situation requiring a trade-off