According to 2004 estimates, from the 2652 MW of generation installed in Baja California, only 75% was effective capacity (2000 MW); this amount should satisfy the peak demand in this system isolated from the national grid. However, it was necessary to import energy from the US in 10 of the 15 years studied because the electricity peak of demand grew between 6% and 7% annually.