1. Determine whether vertical software packages exist for training operations management.
Search the Internet and draft a message describing the results.
2. Investigate the possibility of outsourcing the TIMS system. List the options, together with
advantages and disadvantages of each.
3. Follow Jesse’s e-mail instructions about calculating payback, ROI, and NPV for the TIMS
system.
4. Jesse wants my thoughts on how we can use prototyping for TIMS. She also wants me to
prepare a system requirements document and a management presentation.