A huge challenge in this project was the sewage, which has to be dealt with on-site. The drainage system has to be able to cope with large amounts of water during the rainy season. The existing sanitary facilities at Safe Haven Orphanage were narrow, dark and have concrete flooring that accumulated water and dirt.