Sorry for belated information.
Although we booked 3 x 40’GP at the first time and carrier confirmed it.
40’GP wasn’t enough at the time of CNTR stuffing.
So carrier ensured same cost for 40’HC as 40’GP’s cost .
I am still final SWB from carrier now.
Will let you have all final shipping document within today as soon as B/L is issued .