: Estimate & Take Off Material
: Make BOQ for Bidding
: Control Schedule Three Weeks Look Ahead Schedule
: Weekly Progress Report
: Grounding System Installation
: Design Typical Installation and Shop Drawing Details
: Make Cable Drum and Cable Schedule
: 3.3 kV Switch Board Installation
: 415V Switch Board Installation
: Lighting System Installation
: Coordinate MV ,LV Switch Board Test ( CT, VT and ETC )
: Coordinate Motor and Tranformer Test
: As Built Drawing ( CAD File )
: Pre -Commisioning and Commisioning