Routine tests include the following:
a) inspection of the assembly including inspection of wiring and, if necessary, electrical operation test (8.3.1);
b) a dielectric test (8.3.2);
c) checking of protective measures and of the electrical continuity of the protective circuit (8.3.3).
d) verification of insulation resistance
assembly including inspection