BMP Construction
The BMP model indicates areas where best management practices may be constructed (Figure 10). BMP site analysis displays where construction is restricted. 100-foot buffers of rivers, streams, other wetlands, sinkholes, and the one-year time of travel within a DWSMA are pictured in red. Areas displayed in blue require drinking water monitoring while areas in brown are clay mixtures that require soil testing. Areas in yellow require both tests. The region in green represents permissible construction of BMP’s.